The oversite is built on the levelled out and compacted ground within the building and it is thickened out beneath the dwarf or sleeper walls. |
|
The integrity of the concrete oversite is crucial to the strength and stability of the finished structure. |
|
On the flat oversite one places a system plate, with or without insulation. |
|
To address this issue, the department is providing certified operator oversite by contracting with certified operators, where required. |
|
Williams's role is oversite and day to day management of the C-Level Team and board directorships and advisors. |
|
Insulation board is placed on the oversite. |
|